0.5ml pasteur pipette making blowing manufacturer machine

FOB Reference Price:Get Latest Price
US $23,788-28,888 / Sets | 1 Set/Sets (Min. Order)
Model Number:
TVHD-1L-3
Report Suspicious Activity
Overview
Quick Details
Condition:
New
Application:
Plastic hollow product
Plastic Processed:
PE
Blow Moulding Type:
Extrusion Blow Moulding
Automatic:
Yes
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
TONVA
Voltage:
Customized
Power(W):
25KW
Dimension(L*W*H):
2.7*1.6*1.9M
Weight:
4.2T
Certification:
ISO9001,CE,SGS
Warranty:
1 year
After-sales Service Provided:
Engineers available to service machinery overseas
Power:
Hydraulic
Die Head:
3
Station:
Double
Cavity:
6 pcs in each station
Supply Ability
Supply Ability:
400 Set/Sets per Year
Packaging & Delivery
Packaging Details
film packing; fix four feet of blow molding machine in the container;
Port
NINGBO
Lead Time :
Quantity(Sets) 1 - 1 >1
Est. Time(day) 45 To be negotiated
Application
Machine

Technical Characteristic

1.The machine adopt hydraulic power system.
2.Application range:pasteur pipette,etc.
3.Suitable for raw material of PE,etc.
4.All parts adopts international famous brand,easy for installation and matainence.
5.Three die heads and double stations.

Item
Unit
Parameter
Raw material
---
PE/PP etc
Number of Die Head
---
3
Weight
T
4.2
Dimension(L×W×H)
M
2.7*1.6*1.9
Contact me,let's discuss more.
Parts
Packing & Delivery

Delivery Date

Within 45 workdays after receiving the deposit and samples/drawing confirmation by buyer and TONVA.

Port of Loading

NINGBO, CHINA.

Payment

30% TT deposit, balance before shipment.
About Us
Service Support

Adhere to customer service as the center, continuing to provide customers with a one-stop service beyond the expectations of the customer service, guest house forever partners, which we have been insisting and advocate the concept of service. We stand in the customer's position, pay attention to the customer's opinion, and constantly improve our service system and related processes, to maximize the satisfaction of customer needs. Our five service standards:
1,Customer is always the first.
2,Customer satisfaction is the standard of our work.
3,Courtesy, wholeheartedly.
4,Real price, quality first.
5,Full cooperation, to ensure rapid. Our "Five" service standards:
6,Sincerely treat customers -- a matter of conscience.
7,Close - standing customer perspective, heart to heart.
8,Careful - careful, do not leave out a problem, do not let go of a detail.
9,Patient: remain patient in the service process, do not bother to answer questions, 100 not tire.
10,Rest assured that the service results so that customers can rest assured.


After-sale service
1. Debugging and installation
Before delivery, we are responsible for the commissioning of the machine, by the user in our factory testing and acceptance, to meet the requirements of the product quality before shipment.
2. User training
If the user needs, we are responsible for sending technical personnel to the user to install and debug and training, the cost of our own burden.
3. Defects Liability Period
Machine under normal production and maintenance, the main components such as motor, screw, gear box, computer, inverter in one year, there is a failure, we are responsible for two days to reach the replacement.

Contact Us