Hot sale full automatic plastic bottle making 5l hydraulic blow molding machine with CE certification

FOB Reference Price:Get Latest Price
US $32,800-41,800 / Sets | 1 Set/Sets (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Condition:
New
Application:
Bottle
Plastic Processed:
PE
Blow Moulding Type:
Extrusion Blow Moulding
Automatic:
Yes
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
TONVA
Model Number:
TVHD-5L
Voltage:
Customized
Power(W):
58kw
Dimension(L*W*H):
3.5*2.1*2.1m
Weight:
7800kg
Certification:
ISO9001,CE,BV,SGS
Warranty:
1 year
After-sales Service Provided:
Engineers available to service machinery overseas
Working Station:
Double
Product max capacity:
5L
Die head number:
1 to 7
Power:
Hydraulic
Filter:
Adopt
Up&Down platen:
optional
Multi layer:
optional
View stripe:
optional
Parison controller:
optional
Supply Ability
Supply Ability:
400 Set/Sets per Year Warmly welcome to visit our factory
Packaging & Delivery
Packaging Details
film packing; fix four feet of blow molding machine in the container;
Port
NINGBO
Lead Time :
55 workdays
Product Show

Technical Characteristic

1.TVHD series Double station machine is adopted pure hydraulic.With compact structure,running stable and easy to control.

2.Products size range:suitable for 5ml to 5L all kinds of hollow products.

3.Application range:can be used as packing for food,medical,oil,chemical,cosmetic,autoparts,tools and toys etc.

4.Suitable for raw material of PE,PP,PA,PC,ABS,TPU,EVA,PETG etc.

5.Pure hydraulic system:Optimized hydraulic oil loop design gains a stable,fast,power saving property.

6.All parts adopts international famous brand,easy for installation and matainence. 

7. Die-heads for choosing :

     single die-head(2L to 5L,200g): 5L --- around 210 bottles per hour:
     double die-heads(1.5L to 2L,120g): 2L --- around 420 bottles per hour;
     triple die-heads(500ml to 1L,70g): 1L --- around 840 bottles per hour;
     four die-heads(200ml to 500ml,40g) :500ml --- around 1460 bottles per hour;
     and so on.
Certifications
Parts
Detailed Images

PLC

1.Adopting MITSUBISHI PLC to control the action program of the whole machine;


2.The process of production can be changed easily by special programming, in order to meet the different kinds of requirements.

Main Features

1.Double tie-bar, Jonit-Type clamping, clamping by hydraulic cylinders

2.The clamping unit adopts clamp-style with two platens, forced by hydraulic cylinder at the bottom. This special structure ensures the rigid feature of the platen and in order to keep the even of force forward on the mould.

Electric System

1.Adopt AC contactor and thermal overload protection relays;

2.Adopt solid state and auxiliary relay;

3.Equip cooling fans to control the temperature;

Parison Control System(Optional)

1.Adopt imported Japan MOOG 100 points parison controller, cooperating with special electronic scale, make the parison thickness can be freely adjusted during ejection, to meet ideal requirements.
2.To get good quality, by controlling the thickness of bottles each part as required.
3.To reduce the cost of bottle, can divided the raw material more even from up to bottom.
4.Independent hydraulic power pack unit for parison control cylinder;

MULTIPLE LAYER(Optional)

Packing & Delivery

Delivery Date

Within 55 workdays after receiving the deposit and samples/drawing confirmation by buyer and TONVA.

Port of Loading

NINGBO, CHINA.

Payment

30% TT deposit, balance before shipment.
Service Support

Adhere to customer service as the center, continuing to provide customers with a one-stop service beyond the expectations of the customer service, guest house forever partners, which we have been insisting and advocate the concept of service. We stand in the customer's position, pay attention to the customer's opinion, and constantly improve our service system and related processes, to maximize the satisfaction of customer needs. Our five service standards:
1、Customer is always the first.
2、Customer satisfaction is the standard of our work.
3、Courtesy, wholeheartedly.
4、Real price, quality first.
5、Full cooperation, to ensure rapid. Our "Five" service standards:
6、Sincerely treat customers -- a matter of conscience.
7、Close - standing customer perspective, heart to heart.
8、Careful - careful, do not leave out a problem, do not let go of a detail.
9、Patient: remain patient in the service process, do not bother to answer questions, 100 not tire.
10、Rest assured that the service results so that customers can rest assured.


After-sale service
1. Debugging and installation
Before delivery, we are responsible for the commissioning of the machine, by the user in our factory testing and acceptance, to meet the requirements of the product quality before shipment.
2. User training
If the user needs, we are responsible for sending technical personnel to the user to install and debug and training, the cost of our own burden.
3. Defects Liability Period
Machine under normal production and maintenance, the main components such as motor, screw, gear box, computer, inverter in one year, there is a failure, we are responsible for two days to reach the replacement.

Contact Us